Construction Technology II - 6.02
Quiz
Mud sills are required when shoring is:
- Erected on a solid foundation.
- Erected on soil.
- Made entirely of lumber.
- Made of prefabricated components.
A piece of wood placed inside a form to hold the sides of the form the proper distance apart is called a:
- Cleat.
- Ledger.
- Spandrel.
- Spreader.
Upright members used to stiffen or reinforce the form are:
- Braces.
- Keyways.
- Spreaders.
- Strongbacks.
What horizontal members are used to brace the form and support the studs?
- Braces
- Form ties
- Sheathing
- Walers
What holds the two sides of a wall form in position?
- Anchor
- Form tie
- Spreader
- Waler
Openings for windows and doors can be formed by using:
- Bucks.
- Kickers.
- Plates.
- Plyform.
What is a temporary brace used to support above-grade concrete slabs while they harden?
- Buck
- Kicker
- Mud sill
- Shoring